Modular office building, training center for medical service

Delivery term:The date of payment from buyers deliver within days
  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Beijing

  • Validity to:

    Long-term effective

  • Last update:

    2017-08-20 19:36

  • Browse the number:

    191

Send an inquiries
Company Profile
Shanghai Haicheng Special Steel Container Co. Ltd
Contactaixin:

shhaicheng(Ms.)  

telephone:

(86 21) 68968030 Ext:836 (86 21) 15821753157

Arrea:

Beijing

Address:

No.399,Shiwan 6th Road, Airport Town, Pudong New Area, Shanghai, Shanghai, China (201202)

Website:

http://shhaicheng.craigchapmansdrivngschool.com/

Product details

Model Number: SFP- Office Brand Name: SHS HOUSE Key Specifications/Special Features: General information :Each individual cabin must be placed on foundations provided on site (e.g. wood, concrete) with at least 4 points of support for 10’ cabins, 6 points of support for 16’ or 20’ cabins (attachment 6.5) and 8 points of support for 30’ cabins (attachment 6.6)The dimensions of the foundation has to be adapted to local circumstances, norms and frost line, under consideration of the local soil condition and the maximum possible loadsThe levelness of the foundation is a precondition for a smooth assembly and the failure-free standing of the entire constructionDuring set up or placement of the cabin (constructions), maximum permitted loads and regional conditions (e.g. snow loads) must be taken into accountPossible combinations of several cabins:Individual cabins can be selectively configured next to, behind, or on top of each other, while bearing in mind the structural indications and the max. permitted loadsFor one-level (ground level) constructions, the cabins may be placed arbitrarily and without restriction regarding quantityFor two- and three-storey buildings, the combination possibilities presented in appendix 6.1/ 6.2 (10’, 16’ and 20’ cabins) or in 6.3/ 6.4 (24’ and 30’ cabins) must be followedIn case the cabins are linked in other combinations than presented in appendix 6.1/ 6.2 (10’, 16’ and 20’ cabin) or appendix 6.3 / 6.4 (24’ and 30’ cabin), we can give no statement about the max. permitted wind loadWe categorically recommend keeping a distance from such a practice or to carry out additional anchoring (bolting, supports and more) with the approval of authorised experts

The containers must be stacked exactly on top of each other
The special SHS-stacking cones must be used

The container roof is not suitable for storage of goods and materials

The SHS assembly manuals need to be followed

Sanitary fittings:
After connecting with the water supply the entire water circulation should be checked once more on water tightness (possible loosening during transport)

SHS denies any warranty for damages, which may result from placement contrary to the principles
Liability for consequential damages is excluded on principle
Shipping Information:
  • FOB Port: Shanghai
  • Lead Time: 5 - 10 days
Main Export Markets:
  • Asia
  • Australasia
  • Central/South America
  • Eastern Europe
  • Mid East/Africa
  • North America
  • Western Europe